Politics & Government

Tappan Zee Bridge Deck Replacement Work Resumes

Overnight construction runs Nov. 4 to 11; expect travel delays.

Deck replacement on the Tappan Zee Bridge will continue during the week of Nov. 4 to 11, according to the New York State Thruway Authority.

The work is weather-dependent, and is subject to change.

Traffic updates will be broadcast to motorists via electronic signs along the highway and by Highway Advisory Radio 530 AM in the Tappan Zee Bridge corridor, as well as 1610 in the Newburgharea. To see real-time webcam views of the bridge and approaches, go to http://www.thruway.ny.gov/travelers/map/index.html?layer=cameras

Find out what's happening in Nyack-Piermontwith free, real-time updates from Patch.

Monday to Wednesday

Work will begin at 8 p.m. resulting in the closure of two left southbound lanes and an additional left southbound lane at 11 p.m. until 6 a.m., on the Tappan Zee Bridge. In addition, this will result in the closure of one left northbound lane at 8 p.m. and an additional left northbound lane at 11 p.m. until 6 a.m. on theTappan Zee Bridge. At least one lane southbound will be opened to traffic from 8 p.m. to 6 a.m. and one lane northbound will be opened to traffic from 8 p.m. to 6 a.m.

Find out what's happening in Nyack-Piermontwith free, real-time updates from Patch.

During Monday through Wednesday night operations, due to the southbound lane closures, the southbound entrance at Exit 10 South Nyack will be closed from 8 p.m. to 6 a.m., and southbound detour route signs will be posted through Nyack for the entrance at Route 59 near Exit 11.

During Monday through Wednesday night operations, due to the northbound lane closures, the entrance ramp from Broadway southbound in Tarrytown will also be closed from 8 p.m. until 6 a.m. All traffic will be detoured to the entrance ramp from Route 119.

Thursday

Work will begin at 8 p.m. resulting in the closure of two left southbound lanes and an additional left southbound lane at 11 p.m. until 6 a.m., on the Tappan Zee Bridge. In addition, this will result in the closure of one left northbound lane at 10 p.m. and an additional left northbound lane at 12 midnight until 6 a.m., on the Tappan Zee Bridge. At least one lane southbound will be opened to traffic from 8 p.m. to 6 a.m. and one lane northbound will be opened to traffic from 10 p.m. to 6 a.m.

During Thursday night operations, due to the southbound lane closures, the southbound entrance at Exit 10 will be closed from 8 p.m. to 6 a.m. and southbound detour route signs will be posted through Nyack for the entrance at Route 59 near Exit 11.

During Thursday night operations, due to the northbound lane closures, the entrance ramp from Broadway southbound in Tarrytown will also be closed from 10 p.m. until 6 a.m. All traffic will be detoured to the entrance ramp from Route 119.

Friday

Work will begin at 9 p.m. resulting in the closure of two left southbound lanes and an additional left southbound lane at 11:30 p.m. until 6 a.m., on the Tappan Zee Bridge. In addition, this will result in the closure of one left northbound lane at 10 p.m. and an additional left northbound lane at 11:30 p.m. until 6 a.m. on the Tappan Zee Bridge. At least one lane southbound will be opened to traffic from 9 p.m. to 7 a.m., and one lane northbound will be opened to traffic from 10 p.m. to 7 a.m.

All lanes will be opened to traffic in both directions by 7 a.m. on Saturday.

During Friday night operations, due to the southbound lane closures, the southbound entrance at Exit 10 will be closed from 9 p.m. to 6 a.m. and southbound detour route signs will be posted through Nyack for the entrance at Route 59 near Exit 11.

During Friday night operations, due to the northbound lane closures, the entrance ramp from Broadway southbound in Tarrytown will also be closed from 10 p.m. until 7 a.m. All traffic will be detoured to the entrance ramp from Route 119.

November 10 - 11

Work will begin at 11 p.m. resulting in the closure of two left southbound lanes and an additional left southbound lane at 12 midnight until 8 a.m. on the Tappan Zee Bridge. In addition, this will result in the closure of one left northbound lane at 11 p.m. and an additional left northbound lane at 12 midnight until 8 a.m. on the Tappan Zee Bridge. At least one lane southbound will be opened to traffic from 11 p.m. to 9 a.m. and one lane northbound will be opened to traffic from 11 p.m. to 9 a.m.

All lanes will be opened to traffic in both directions by 9 a.m. on Sunday.

During Saturday night operations, due to the southbound lane closures, the southbound entrance at Exit 10 will be closed from 11 p.m. to 8 a.m. and southbound detour route signs will be posted through Nyack for the entrance at Route 59 near Exit 11.

During Saturday night operations, due to the northbound lane closures, the entrance ramp from Broadway southbound in Tarrytown will also be closed from 11 p.m. until 8 a.m. All traffic will be detoured to the entrance ramp from Route 119.

During Saturday night operations, the northbound lane on River Road in Nyack will be closed between 9 p.m. and 8 a.m.  The southbound lane will be open; however, periodic stoppages will be required.

No work scheduled for Sunday night, Nov. 11

The lane closures on Monday through Saturday nights are required in order for the contractor to continue with the replacement of the deck in the middle three lanes on the Tappan Zee Bridge.

During the nighttime operations, several 20 minutes traffic stoppages will take place in both the northbound and southbound directions.

For the safety of the public and construction workers, motorists are urged to proceed with caution and obey posted work-zone speed limits.

The second phase of the deck replacement project is slated for completion in the Winter of 2012.


Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.

We’ve removed the ability to reply as we work to make improvements. Learn more here